Skip to product information
1 of 11

PayPal, credit cards. Download editable-PDF & invoice in 1 second!

NB/T 31073-2015 English PDF (NBT31073-2015)

NB/T 31073-2015 English PDF (NBT31073-2015)

Regular price $730.00 USD
Regular price Sale price $730.00 USD
Sale Sold out
Shipping calculated at checkout.
Delivery: 3 seconds. Download true-PDF + Invoice.
Get QUOTATION in 1-minute: Click NB/T 31073-2015
Historical versions: NB/T 31073-2015
Preview True-PDF (Reload/Scroll if blank)

NB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects
NB/T 31073-2015
NB
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
P 61
Filing No.: J2040-2015
P NB/T 31073-2015
Occupational safety and health acceptance
specification for wind power projects
ISSUED ON: APRIL 02, 2015
IMPLEMENTED ON: SEPTEMBER 01, 2015
Issued by: National Energy Administration
Table of Contents
Foreword ... 6 
1 General provisions ... 7 
2 Terms ... 8 
3 Acceptance conditions ... 9 
4 Acceptance procedure ... 10 
5 Main contents of acceptance ... 15 
6 Compilation requirement and content of acceptance file ... 17 
Appendix A Acceptance procedure ... 19 
Appendix B Application form of acceptance (Format) ... 20 
Appendix C Main contents of acceptance outline process ... 22 
Appendix D Acceptance certification ... 24 
Appendix E Acceptance test report format ... 26 
Appendix F Design of self-reporting requirements and main contents ... 29 
Appendix G Main contents of construction and operation of self-inspection
report ... 31 
Appendix H Main contents of construction installation of self-inspection report
... 32 
Appendix J Main contents of construction and operation of self-inspection report
... 33 
Explanation of wording in this specification ... 36 
List of normative references ... 37 
Additions: explanation of provisions ... 38 
Occupational safety and health acceptance
specification for wind power projects
1 General provisions
1.0.1 In order to standardize and guide the special completion acceptance of
labor safety and industrial hygiene of wind farm projects, this Specification is
hereby formulated, in accordance with national laws, regulations, rules,
standards, other requirements.
1.0.2 This Specification is applicable to the special completion acceptance of
labor safety and industrial hygiene of newly built, rebuilt and expanded grid-
connected onshore wind farm projects and offshore wind farm projects.
1.0.3 The scope of the special completion inspection and acceptance of the
labor safety and industrial hygiene of the wind farm project, includes the safety
protection facilities of the wind turbines involved in the wind farm project and
the supporting voltage boosting equipment, current collection lines, booster
stations, other auxiliary facilities of the wind farm.
1.0.4 The special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, is divided into three stages: application for
acceptance and data pre-review, on-site inspection and joint review, review and
acceptance.
1.0.5 For the special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, the acceptance committee, which is
composed of the presiding organization for acceptance and the safety
supervision department where the project is located, shall carry out the
acceptance work.
1.0.6 The project owner shall report the use of engineering safety facilities and
major engineering incidents (accidents), to the presiding organization of
acceptance, within 2 years, after the special completion acceptance of the labor
safety and industrial hygiene.
1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind
farm projects, shall not only comply with this Specification, but also comply with
the current relevant national standards.
4 Acceptance procedure
4.1 Organization of acceptance
4.1.1 The acceptance presiding organization is responsible for organizing the
completion acceptance of the labor safety and industrial hygiene. The
acceptance presiding organization, together with the government safety
supervision department and other organizations, form an acceptance
committee AND an acceptance expert group. The acceptance committee is
responsible for verifying the acceptance appraisal; the acceptance expert group
conducts on-site inspections.
4.1.2 The acceptance committee is composed of the chairman, vice-chairmen,
members. The chairman of the acceptance committee is generally assumed by
the representative of the acceptance presiding organization; the vice-chairman
is the representative of the safety supervision department of the people's
government where the project is located and the representative of the project
owner’s superior department. The members include the representatives from
the participated project construction organization AND the operation
organization, as well as the acceptance expert team leader, etc.
4.2 Application acceptance
4.2.1 When the project has the completion acceptance conditions for labor
safety and industrial hygiene, the project owner shall submit the completion
acceptance application for labor safety and industrial hygiene, to the
acceptance presiding organization, according to the acceptance procedures
(see Appendix A); meanwhile submit the following documents and materials,
with one copy of the electronic version (CD-ROM) attached:
1 Acceptance application report and application form (3 copies). The format
of the application form is as shown in Appendix B of this Specification.
2 Design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, construction and
operation self-inspection report (3 copies each), for the completion
acceptance of labor safety and industrial hygiene.
3 Safety acceptance evaluation report (draft for review) (10 copies), which is
prepared by a correspondingly qualified safety evaluation agency.
4.2.2 The project owner shall prepare the following documents and materials
for reference (original if necessary), at the same time:
1 Safety pre-evaluation report and its review opinions.
determine the member units of the acceptance committee; organize
experts in related disciplines, to establish an acceptance expert group.
2 The acceptance presiding organization shall prepare an acceptance work
outline, before the on-site inspection; copy the acceptance work outline to
each member unit of the acceptance committee. The main content of the
acceptance work outline is as shown in Appendix C of this Specification.
4.4.2 On-site inspection and review:
1 The acceptance expert group conducts an on-site inspection; conducts a
technical review of the safety acceptance evaluation report (draft for
review); proposes on-site inspection opinions AND preliminary opinions
on the safety acceptance evaluation report review.
2 After the labor safety and industrial hygiene facilities of the wind farm
project have passed the expert on-site inspection, the project owner shall
carry out rectification, in accordance with the on-site inspection opinions
of the inspection and acceptance of safety and industrial hygiene; submit
a formal written rectification report, to the acceptance presiding
organization. When necessary, the acceptance presiding organization
shall review the implementation of on-site rectification by the project owner.
If the labor safety and industrial hygiene facilities of the wind farm project
fail the on-site inspection and acceptance by experts, the project owner
shall make rectifications, in accordance with relevant national regulations
AND the on-site inspection opinions of the completion acceptance of labor
safety and industrial hygiene; perform safety acceptance evaluation again,
before following the procedures to apply for the completion acceptance of
labor safety and industrial hygiene.
3 If the safety acceptance evaluation rep...
View full details