Skip to product information
1 of 12

PayPal, credit cards. Download editable-PDF and invoice in 1 second!

GB/T 36547-2024 English PDF (GBT36547-2024)

GB/T 36547-2024 English PDF (GBT36547-2024)

Regular price $320.00 USD
Regular price Sale price $320.00 USD
Sale Sold out
Shipping calculated at checkout.
Delivery: 3 seconds (Download full-editable-PDF + Invoice).
Quotation: Click GB/T 36547-2024>>Add to cart>>Quote
Editable-PDF Preview (Reload if blank, scroll for next page)

See Chinese contents: GB/T 36547-2024
GB/T 36547-2024: Technical requirements for connecting electrochemical energy storage station to power grid
This document stipulates the overall requirements for connecting electrochemical energy storage stations to the power grid, as well as the technical requirements for power control, primary frequency control, inertia response, fault ride-through, operation adaptability, power quality, relay protection and automatic safety devices, dispatching automation and communication, simulation models, and test and evaluation of connection to the power grid. This document is applicable to the construction, connection, commissioning, test, inspection, operation, maintenance and overhaul of newly constructed, renovated and expanded electrochemical energy storage stations connected to the public power grid through voltage levels of 10 (6) kV and above.

Read this Google-Book: GB/T 36547-2024
Buy this Google-Book: GB/T 36547-2024
Germany Google-Book: GB/T 36547-2024
Japan Google-Book: GB/T 36547-2024
Korea Google-Book: GB/T 36547-2024

View full details